Earned Value Management Jobs in San Diego
Search jobs in
1 - 15 of 15
Search Results - Earned Value Management Jobs in San Diego
Indotronix International Corp-San Diego
Bulletins (AWB) • Control Account Management (CAM) and Earned Value Management System (EVMS) experience including Integrated Master Schedule (IMS) planning and tracking, Earned Value reporting, variance analysis, and Estimate at Complete (EAC) forecasting...
Northrop Grumman-San Diego
track, and complete program requirements
• Establish and manage the program and subordinate baselines
• Develop and adhere to budget baselines utilizing Earned Value Management (EVM) or similar cost & schedule control methodologies and tools
• Identify...
DP Professionals Inc-San Diego
Experience with USAF Airworthiness Policy Directives, Instructions, and Airworthiness Bulletins (AWB). * Control Account Management (CAM) and Earned Value Management System (EVMS) experience including Integrated Master Schedule (IMS) planning and tracking...
Northrop Grumman-San Diego
adequacy, and suitability.
Basic Qualifications:
• Bachelor's degree in engineering or other STEM-related field relevant software development integration work experience.
• Earned Value Management
• Demonstrated knowledge of Agile software...
ASD, Inc.-San Diego
Experience with USAF Airworthiness Policy Directives, Instructions, and Airworthiness Bulletins (AWB)
• Control Account Management (CAM) and Earned Value Management System (EVMS) experience including Integrated Master Schedule (IMS) planning and tracking...
Blue Origin-San Diego
industry and/or R&D programs preferred) - less experience could be hired at a lower labor grades
• Proficiency with schedules using Primavera (P6), MS Project, or similar software
• Earned value management experience including cost and schedule baselining...
Northrop Grumman-San Diego
environment
• Minimum 1 year of experience with EVMS (Earned Value Management System)
• Must have an active DoD Secret Security Clearance and have the ability to obtain and maintain Special Program Access
• Ability to travel at least 10%
• Must be able to work...
AECOM-San Diego
and exposure to industry-leading tools and methodologies, including scheduling, earned value management, risk analysis, cost engineering, and change management. Successful candidates can advance into senior project controls, cost engineering, scheduling...
smartrecruiters.com -
Northrop Grumman-San Diego
Value Management (EVM) responsibilities, including cost, schedule, and technical performance for assigned work scope.
• Develop and maintain standard operating procedures, configuration documentation, and operational playbooks for supported systems...
Fuse Integration-San Diego
and deployment of complex systems
• Experience with DoD R&D process and life cycle management
• Operational or developmental background with airborne platforms and systems
• Proficiency with MS Project, Jira, or similar PM tools, and exposure to Earned Value...
workable.com -
Northrop Grumman-San Diego
to obtain and maintain Program Access (PAR) within reasonable time
• Knowledge of Earned Value Management
• Prior test pilot / experimental / developmental test experience or military pilot experience
• Demonstrated experience leading flight or ground test...
Northrop Grumman-San Diego
Special Access Program (SAP) clearance, within a reasonable amount of time as determined by business needs.
• Must have prior CAM and Earned Value Management experience
• Must have understanding of program risk, opportunity and issue management process...
appcast.io -
Northrop Grumman-San Diego
Knowledge of ICBM flight test preparation and test procedures
• Experience with developmental flight test operations in the Aerospace Industry
• Experience in the development of flight test plans and procedures for a rocket system
• EVMS (Earned Value...
Northrop Grumman-San Diego
as project management planning and presentation skills
• Proficient with MS Project, Excel, Power Point, Word
• Demonstrated ability to create trusted relationships
• Experience with Jira and Confluence tools
• Prior CAM and Earned Value Management experience...
appcast.io -
L3Harris Technologies, Inc.-San Diego
in Project Management, with PMP certification.
• Experience with Earned Value Management System (EVMS) concepts
• Experience in all phases of project and program management, from proposal and ensuing negotiations through contract award, project planning...
appcast.io -
Companies now hiring in San Diego:
Earned Value Management jobs in San Diego – Similar offers:
Earned Value Management jobs – More cities:
Broaden your job search:
Don’t miss out on new job openings!
Create a job alert for: Earned Value Management, San Diego
It's free, and you can cancel email updates at any time